One of the archways into the new Lodge is completed, and interior decoration continues

The first archway is now complete, and we've started work on the second. 

First fix electrical installation in the front reception area and arch walkway is continuing, and we've started underfloor ducting for future electrical routes. 

We've begun the decoration in the welfare ceiling, alongside ceiling and cornice repairs, and continuing second fix carpentry. 

Plaster repairs have been carried out in the welfare area, and, in the student post room and parcel room, decoration is approaching the final coat. The final coat will be applied after joinery and lighting installation. Plinths for the pigeon holes in the post room are being made, in preparation for the installation when they're delivered. 


Ian Stokes, Master of Works

Update 16: 10 July 2020