Update 24: 11 September 2020
We've started to reinstate the existing flagstones in the main entrance, around the new archways.
A further coat of lime plaster has been added to the archway wall, with one further coat still required.
Further decoration and prep work has been carried out in the reception area, and the installation of oak panelling is underway in the welfare room in preparation for the installation of the glass.
The lighting pelmet has now also been installed above the student post room pigeon holes.
Ian Stokes, Master of Works